07 / Facility
Clean structure.Raw energy.
A green steel industrial shell, a covered sled lane, a strength floor, physiotherapy, and a recovery zone with sauna and cold water.
Exterior



Access

Training





Recovery




Project renders. The build is delivered in August 2026.